Installation of Shifting and Installation of Ticket Vending machines (10 Nos) at 8 Stations in UAE.
- Enabling works at the TVM Bay including Cladding panel removal, Pulling of the Electrical and the Data Cables, Cutting of the steel frames, Installation of anchor bolts as per the TVM’s installation requirements and Closing of the cladding panels
- TVM Installation Phase including Delivery of the TVM at the stations, Installation of the TVM at the bay., Termination of Power and Data Cable at the TVM ports and Termination of the data cables and electrical cables at the assigned cabinets and power panels
- Client : Serco
- Date : 2017-2018
- Location : Dubai Metro
- Project Name : Ticket Vending machines and Ticket Operating Machines installation works
- Employees : 15